PpKR
PpKR

PpKR

      |      

سبسکرائبرز

   تازہ ترین ویڈیوز

PpKR
2 مناظر · پہلے 5 گھنٹے

https://www.facebook.com/share/16YU5UBakA/


⁣PRADEEP KUMAR PKKK GAMING

MY SECOND YOUTUBE CHANNEL SUBSCRIBE ALL FRIENDS LINK👇

Name. SKKK GAMING
https://youtube.com/channel/UC....wI40LlxqkWBkOVyPKP2g

INSTRAGRAM. LINK 👉 https://www.instagram.com/pradeep_kumar_pkkk_gam


TWITTER LINK.
https://twitter.com/PkkkKumar?s=09


FACEBOOK LINK. https://www.facebook.com/profi....le.php?id=1000281639


MOJ ACCOUNT LINK. https://mojapp.in/@pradeepkumarpkkkgaming


THANK FOR WATCHING
PLEASE SUBSCRIBE ALL FRIENDS FOLLOW GYS

PpKR
7 مناظر · پہلے 18 گھنٹے

⁣PRADEEP KUMAR PKKK GAMING

MY SECOND YOUTUBE CHANNEL SUBSCRIBE ALL FRIENDS LINK👇

Name. SKKK GAMING
https://youtube.com/channel/UC....wI40LlxqkWBkOVyPKP2g

INSTRAGRAM. LINK 👉 https://www.instagram.com/pradeep_kumar_pkkk_gam


TWITTER LINK.
https://twitter.com/PkkkKumar?s=09


FACEBOOK LINK. https://www.facebook.com/profi....le.php?id=1000281639


MOJ ACCOUNT LINK. https://mojapp.in/@pradeepkumarpkkkgaming


THANK FOR WATCHING
PLEASE SUBSCRIBE ALL FRIENDS FOLLOW GYS

Tile work involves preparing the surface, laying out the tile pattern, mixing adhesive, cutting tiles as needed, adhering tiles to the prepared surface, and then applying grout to the joints. Key steps include proper sub-surface preparation, using spacers for uniform joints, ensuring the tiles are level, allowing the adhesive to cure, cleaning the tiles during installation, and then grouting and cleaning the joints.
This video demonstrates the process of laying floor tiles, including checking for level and alignment:
Surface Preparation
Clean and level the surface: Ensure the subfloor or wall surface is clean, dry, smooth, and structurally sound.
Prepare the substrate: For floors, this may involve cleaning existing concrete or preparing a suitable base. For walls, ensure plasterwork is complete and waterproof where necessary.
Waterproofing: If tiling an area exposed to water (like a bathroom), apply a waterproofing layer.
2. Layout and Dry Lay
Mark layout lines: Establish center lines for your layout using a spirit level or laser level to guide the tile placement.
Dry lay: Lay out tiles on the surface without adhesive to visualize the pattern, assess cuts, and make adjustments to the layout for better results.
3. Mixing and Applying Adhesive
Mix adhesive/mortar: If using a traditional method, mix cement and sand with water to create a honey-like consistency mortar.
Apply adhesive: Spread the adhesive evenly on the prepared surface using a notched trowel.
4. Setting the Tiles
Place tiles: Begin placing tiles along the layout lines, pressing them gently into the adhesive with a rubber or wooden mallet to ensure even adhesion and a level surface.
Use spacers: Insert tile spacers to maintain uniform spacing and straightness of the horizontal and vertical joints.
Cut tiles: Use a diamond or wet saw to cut tiles as needed for edges and corners, ensuring clean and accurate cuts.
You can watch this video to learn the basics of tiling a wall, including using tools like a trowel and placing tiles:
5. Grouting and Cleaning
Allow adhesive to cure: Let the adhesive cure completely for the time recommended by the manufacturer.
Apply grout: Once cured, clean the joints and apply grout using a grout float or sponge, forcing it into the gaps.
Clean excess grout: Wipe off excess grout with a damp sponge before it sets, and polish the tiles with a dry cloth to a clean, blemish-free finish.
6. Final Steps
Curing: Allow the tiled area to remain undisturbed for at least 24-48 hours for proper bonding.
Clean the area: Thoroughly clean the completed tiled surface.
Thank you for all family members

PpKR
3 مناظر · پہلے 19 گھنٹے

⁣PRADEEP KUMAR PKKK GAMING

MY SECOND YOUTUBE CHANNEL SUBSCRIBE ALL FRIENDS LINK👇

Name. SKKK GAMING
https://youtube.com/channel/UC....wI40LlxqkWBkOVyPKP2g

INSTRAGRAM. LINK 👉 https://www.instagram.com/pradeep_kumar_pkkk_gam


TWITTER LINK.
https://twitter.com/PkkkKumar?s=09


FACEBOOK LINK. https://www.facebook.com/profi....le.php?id=1000281639


MOJ ACCOUNT LINK. https://mojapp.in/@pradeepkumarpkkkgaming


THANK FOR WATCHING
PLEASE SUBSCRIBE ALL FRIENDS FOLLOW GYS

Tile work involves preparing the surface, laying out the tile pattern, mixing adhesive, cutting tiles as needed, adhering tiles to the prepared surface, and then applying grout to the joints. Key steps include proper sub-surface preparation, using spacers for uniform joints, ensuring the tiles are level, allowing the adhesive to cure, cleaning the tiles during installation, and then grouting and cleaning the joints.
This video demonstrates the process of laying floor tiles, including checking for level and alignment:
Surface Preparation
Clean and level the surface: Ensure the subfloor or wall surface is clean, dry, smooth, and structurally sound.
Prepare the substrate: For floors, this may involve cleaning existing concrete or preparing a suitable base. For walls, ensure plasterwork is complete and waterproof where necessary.
Waterproofing: If tiling an area exposed to water (like a bathroom), apply a waterproofing layer.
2. Layout and Dry Lay
Mark layout lines: Establish center lines for your layout using a spirit level or laser level to guide the tile placement.
Dry lay: Lay out tiles on the surface without adhesive to visualize the pattern, assess cuts, and make adjustments to the layout for better results.
3. Mixing and Applying Adhesive
Mix adhesive/mortar: If using a traditional method, mix cement and sand with water to create a honey-like consistency mortar.
Apply adhesive: Spread the adhesive evenly on the prepared surface using a notched trowel.
4. Setting the Tiles
Place tiles: Begin placing tiles along the layout lines, pressing them gently into the adhesive with a rubber or wooden mallet to ensure even adhesion and a level surface.
Use spacers: Insert tile spacers to maintain uniform spacing and straightness of the horizontal and vertical joints.
Cut tiles: Use a diamond or wet saw to cut tiles as needed for edges and corners, ensuring clean and accurate cuts.
You can watch this video to learn the basics of tiling a wall, including using tools like a trowel and placing tiles:
5. Grouting and Cleaning
Allow adhesive to cure: Let the adhesive cure completely for the time recommended by the manufacturer.
Apply grout: Once cured, clean the joints and apply grout using a grout float or sponge, forcing it into the gaps.
Clean excess grout: Wipe off excess grout with a damp sponge before it sets, and polish the tiles with a dry cloth to a clean, blemish-free finish.
6. Final Steps
Curing: Allow the tiled area to remain undisturbed for at least 24-48 hours for proper bonding.
Clean the area: Thoroughly clean the completed tiled surface.
Thank you for all family members

PpKR
5 مناظر · پہلے 19 گھنٹے

⁣PRADEEP KUMAR PKKK GAMING

MY SECOND YOUTUBE CHANNEL SUBSCRIBE ALL FRIENDS LINK👇

Name. SKKK GAMING
https://youtube.com/channel/UC....wI40LlxqkWBkOVyPKP2g

INSTRAGRAM. LINK 👉 https://www.instagram.com/pradeep_kumar_pkkk_gam


TWITTER LINK.
https://twitter.com/PkkkKumar?s=09


FACEBOOK LINK. https://www.facebook.com/profi....le.php?id=1000281639


MOJ ACCOUNT LINK. https://mojapp.in/@pradeepkumarpkkkgaming


THANK FOR WATCHING
PLEASE SUBSCRIBE ALL FRIENDS FOLLOW GYS

Tile work involves preparing the surface, laying out the tile pattern, mixing adhesive, cutting tiles as needed, adhering tiles to the prepared surface, and then applying grout to the joints. Key steps include proper sub-surface preparation, using spacers for uniform joints, ensuring the tiles are level, allowing the adhesive to cure, cleaning the tiles during installation, and then grouting and cleaning the joints.
This video demonstrates the process of laying floor tiles, including checking for level and alignment:
Surface Preparation
Clean and level the surface: Ensure the subfloor or wall surface is clean, dry, smooth, and structurally sound.
Prepare the substrate: For floors, this may involve cleaning existing concrete or preparing a suitable base. For walls, ensure plasterwork is complete and waterproof where necessary.
Waterproofing: If tiling an area exposed to water (like a bathroom), apply a waterproofing layer.
2. Layout and Dry Lay
Mark layout lines: Establish center lines for your layout using a spirit level or laser level to guide the tile placement.
Dry lay: Lay out tiles on the surface without adhesive to visualize the pattern, assess cuts, and make adjustments to the layout for better results.
3. Mixing and Applying Adhesive
Mix adhesive/mortar: If using a traditional method, mix cement and sand with water to create a honey-like consistency mortar.
Apply adhesive: Spread the adhesive evenly on the prepared surface using a notched trowel.
4. Setting the Tiles
Place tiles: Begin placing tiles along the layout lines, pressing them gently into the adhesive with a rubber or wooden mallet to ensure even adhesion and a level surface.
Use spacers: Insert tile spacers to maintain uniform spacing and straightness of the horizontal and vertical joints.
Cut tiles: Use a diamond or wet saw to cut tiles as needed for edges and corners, ensuring clean and accurate cuts.
You can watch this video to learn the basics of tiling a wall, including using tools like a trowel and placing tiles:
5. Grouting and Cleaning
Allow adhesive to cure: Let the adhesive cure completely for the time recommended by the manufacturer.
Apply grout: Once cured, clean the joints and apply grout using a grout float or sponge, forcing it into the gaps.
Clean excess grout: Wipe off excess grout with a damp sponge before it sets, and polish the tiles with a dry cloth to a clean, blemish-free finish.
6. Final Steps
Curing: Allow the tiled area to remain undisturbed for at least 24-48 hours for proper bonding.
Clean the area: Thoroughly clean the completed tiled surface.
Thank you for all family members

مزید دکھائیں